.

Wednesday, May 22, 2019

INL plans Power Grid Test Bed expansion

INL's Power Grid Test Bed is a 61-mile, 138kV dual-fed power loop complete with seven substations and a control center, all linked with state–of–the–art communications and instrumentation capabilities.
The U.S. Department of Energy’s (DOE’s) Idaho Operations Office is inviting the public to review and comment on a draft environmental assessment that proposes to expand the capabilities of Idaho National Laboratory's (INL) Power Grid Test Bed (PGTB). The test bed supports research, development and testing activities to improve the safety, security and resilience of the U.S. electrical grid.

DOE is proposing to construct a new 16.5-mile, 138-kilovolt overhead electrical line on the 890-square-mile INL desert Site. The new transmission line will consist of approximately 300 power poles located next to an existing transmission line. The new line will run from INL’s Central Facilities Area through the Critical Infrastructure Test Range Complex and end at the Materials and Fuels Complex.

The new power line will provide uninterrupted power for INL site facilities. Currently, researchers conducting experiments must disable and isolate an existing power line to conduct their work. The existing line will provide engineers and research scientists with a dedicated transmission line for conducting energized experiments and testing to support U.S. national security missions. The proposed action will support current and anticipated future use on INL’s Power Grid Test Bed.

In addition to the power line, DOE’s Idaho Office plans to increase the size of fencing around a nearby substation to support larger equipment necessary for the addition of the power line. Several gravel test pads located at various points along the pathway of the transmission line will be constructed or modified to support testing of power grid equipment, including diesel generators, transformers, circuit breakers, switchgear, load banks, instrumentation, and battery trailers.

The document, entitled the Draft Environmental Assessment for Expanding Capabilities at the Power Grid Test Bed at Idaho National Laboratory (DOE/EA-2097) was prepared in accordance with the National Environmental Policy Act and is posted for public review at: https://www.id.energy.gov/insideID/PDF/Draft-EA-2097PGTB.pdf.

The 30-day public comment period on the draft environmental assessment will conclude on June 21, 2019. Comments can be submitted by mail to Jim Jardine, 1955 Fremont Ave., Idaho Falls, ID 83415-1203 or by email to pgtb@id.doe.gov. Paper copies of the document are available on request.